top of page

VIRTUAL ENVIRONMENT PROGRAM

Visually see, check-on and discuss in real-time all issues with regard to the project’s work in progress.

TBRAC has developed The Virtual Environment Program, which focuses on streamlining project development and product installation. This program utilizes File Sharing, Visual Concepts, Telecommunication, Building Information Modeling, BIM Coordination, and Fabrication Shop Drawings, all to ensure that each project is completed efficiently and developed to the highest quality.

VIRTUAL ENVIRONMENT PROGRAM: Video
Architecture Model Sketching

THE VIRTUAL ENVIRONMENT PROGRAM

Problem solving and communication

When Projects are outsourced, the number one issue of clients are real time problem solving and immediate access when the time arise to communicate to individuals who are working on their project.

VIRTUAL ENVIRONMENT PROGRAM: Services
FILE SHARING

FILE SHARING

Provides the client with a secured file transfer account

 Clients can check the progress of their project. Note: Files are updated daily so that the client will always have access to the latest version of the file for discussion and/or printing.

VISUAL CONCEPTS

VISUAL CONCEPTS

Live Video Feed

The Visual Concepts provide the client with access to a live video feed to discuss all issues and/or concerns with regards to their project. Note: This is only provided during normal working hours.

Call Center Employee

TELECOMMUNICATION

Direct Communication

The Telecommunication Component provides the client with the phone number of the project manager and company CEO for means of direct communication for the duration of the project. Coupled with both the File Sharing and Visual Components, the client has the ability to discuss all concern/issues pertaining to their project.

BIM.PNG

BUILDING INFORMATION MODELING (BIM)

3D modeling software

Provides a digital representation of the characteristics of a building and its systems. At TBRAC, we use BIM to become more efficient in project development and to better cater to our clients needs.

BIM Coordination

BIM COORDINATION

Detect  System Conflicts

BIM Coordination is a process in which Clash Detection software is used to determine field conflicts by comparing 3D models of building systems. In other words, the goal is to detect and eliminate major/minor system conflicts prior to product installation.

BIM6.jpg

FABRICATION SHOP DRAWINGS

MEP Shop Drawings are delivered in precise layouts, formats, and standards.

Fabrication Shop Drawings is a drawing or set of drawings produced by the contractor, subcontractor, or fabricator which are typically provided for trade product installation. TBRAC provides fabrication shop drawings in addition to The Virtual Environment Program services.

bottom of page